Some new kitchen stuff: island cart, marble pastry board, and the one door on the right side wasn’t cutting it so I added two drawers.
Got rid of the last remaining boob lamps and hung double pendants over the table.
Microwave!
Moved in and had an electrician run an outlet to the microwave cabinet about a month ago.
Went over to drop some things off and noticed my top cabinet for microwave was delivered so I installed it, and put another layer of mineral oil on the countertops.
Final night of work.
Finished up white door and trim, applied first coat of mineral oil to countertop, installed toe kick, installed two high cabinets, removed all recycling boxes
Caulked and painted base
Cut and installed all remaining baseboards, hung track light
Cabinet front & hardware install. Looking beautiful.
Ugly expansion seams from crooked installed floor begone! Seam binder plus some extra .125 thick underlayment seals the gap perfectly and ready for baseboard.
Cabinet frames installed and leveled, sink mounted to plumbing to mock up for measurements, countertop cut down and opening cut for sink, faucet installed too!!
Hung cabinet rails and fully finished tile. Lots of toggle bolts.